Return To Gallery Menu
 
Two Hoppers for BZak
Time off for Christmas gave me a chance to railfan. The C&E delivered two covered hoppers to BZak. If you are not familiar with this operation, there is a conveyer for unloading bulk materials next to the main. The entire operation takes place on the mainline... only possible on a short line.

Material is offloaded to a front loader. Takes less than five minutes to fill the bucket. Bucket is dumped in a waiting dump truck. Three buckets fill the truck.
 
Location: Roundbottom Road Date: 12/30/2019
Source: -David Lamb Personal Collection  | (http://www.dlamb15.com/wo/)
Photo ID: 2084
Video Link: View Video!
Categories: Prototype Videos |  BZak Unloading Site |  East Roundbottom Blocks |  Private Drive (Black Barn) | 
Quick Link Menu | Home

Western Ohio Story
    Concept
    History
    System Map

Peavine Division Layout
    About the Peavine Layout
    Track Plan
    Guiding Principles
    Engine Roster
    Industries
Other Layouts
    Marien Switching District
    Offal, IN Branch

Influences and Inspirations
    Favorite Layouts

How Do
    Paperwork
The Real Peavine
    About the Peavine
    Prototype Industries
    1987 Inspection Trip
    1965 Timetable

Photo and Video Galleries
    Prototype Gallery
    Peavine Gallery
       Walk The Line
    Model Gallery
About
    Owner: David Lamb
    Contact the WO
    About The Site
    About The Home Page
 
Copyright 2013 - 2024