Picture posted to fb by Jaw Tooth on April 20, 2023. Description below from post.
Derailment update and pics of one of the first trains to pass over the rebuilt track. 2 GP15-1s, 4 grain loads and 20 loads of rock. Corboy Rd was just reopened today by a township trustee and I was the first person to cross the rebuilt crossing. The rock train passed through and had to be cut into two for the Williamsburg hill. A truck pulling a trailer knocked down the crossing gate. Everything is on video and will be posted soon. April 20, 2023
About to stall on the Williamsburg hill. Needed more speed.