These were the two first track projects on CCET in the vicinity of Perintown. The first was a residential crossing with drainage issues undercutting the railroad.
The second was MP 19.5 with an ongoing slide issues. This would be a troublesome spot for some time. Temporary repairs were made but by the summer of 2014 we involved ORDC for emergency funding. The railroad was out of cross level in that curve by 8.5 inches.
|
  |