Time off for Christmas gave me a chance to railfan. The C&E delivered two covered hoppers to BZak. If you are not familiar with this operation, there is a conveyer for unloading bulk materials next to the main. The entire operation takes place on the mainline... only possible on a short line.
Material is offloaded to a front loader. Takes less than five minutes to fill the bucket. Bucket is dumped in a waiting dump truck. Three buckets fill the truck.