|
Return To Gallery Menu
|
  |
Construction Progress 2013
|
|
This shot is the first wall framing to be completed. I'm standing roughly at the front of the helix on Batavia Hill. From left to right would be Summit Road, Clermont Steel, Batavia Transmission, Curliss Road and Georgia Pacific on the top level. On the lower level would be the bridge over the East Fork River in Batavia and the villiage of Batavia.
|
  |
Location:
Peavine Division
|
Date: 2/1/2013
|
Source:
-David Lamb Personal Collection
 | (http://www.dlamb15.com/wo/)
|
Photo ID: 2684
|
Categories:
Village Section | 
Afton Section | 
|
|
|
|
|