Return To Gallery Menu
 
Continuous Run and Layout Tour
On June 10, 2022, I completed temporarily spiking down the last of my mainline and connecting it to the recently finished helix (see https://rumble.com/v14q0re-2022a-construction-update-helix-portsmouth-stagaing-and-the-hillsboro-branc.html?mref=7smot&mc=49a3y) from earlier this year. After making sure a train would run fairly well around the layout, I decided to make a video and share the milestone. In this video, we follow a grain train from east of Newtown to Sardinia. The layout only has scenery around 10% of the track, so I provide a lot of commentary about my plans as we follow the train.
 
Location: Peavine Division Date: 6/11/2022
Source: -David Lamb Personal Collection  | (http://www.dlamb15.com/wo/)
Photo ID: 2754
Video Link: View Video!
Categories: Sardinia Section |  Mt Orebsburg Section |  Afton Section |  Batavia Hill Section |  Village Section |  Roundbottom Section |  Clare Section |  Construction Updates | 
Quick Link Menu | Home

Western Ohio Story
    Concept
    History
    System Map

Peavine Division Layout
    About the Peavine Layout
    Track Plan
    Guiding Principles
    Engine Roster
    Industries
Other Layouts
    Marien Switching District
    Offal, IN Branch

Influences and Inspirations
    Favorite Layouts

How Do
    Paperwork
The Real Peavine
    About the Peavine
    Prototype Industries
    1987 Inspection Trip
    1965 Timetable

Photo and Video Galleries
    Prototype Gallery
    Peavine Gallery
       Walk The Line
    Model Gallery
About
    Owner: David Lamb
    Contact the WO
    About The Site
    About The Home Page
 
Copyright 2013 - 2024