Return To Gallery Menu
 
Western Ohio Railway 2023 Year In Review
The Western Ohio Railway saw more progress in 2023, with some updates and finishing touches to a few scenes from 2022, as well as major progress on the scenery in Mt. Orebsburg.

The video also recaps the camera car project which some of you may be interested in. And I share a few clips from my dads layout.

You can always find out more photos, videos and information about my layout or the real Peavine at www.dlamb15.com/wo.

Video 2023Z, January 20, 2024
 
Location: Peavine Division Date: 1/20/2024
Source: -David Lamb Personal Collection  | (http://www.dlamb15.com/wo/)
Photo ID: 2927
Video Link: View Video!
Categories: Operating Sessions |  Farm Scene |  Lorenzo Piano |  Main Street Williamsburg |  Purinia |  Half Acre Road |  Batavia Transmission |  Clermont Steel |  Summit Road |  East Fork River |  Tealtown-Salt Run | 
Quick Link Menu | Home

Western Ohio Story
    Concept
    History
    System Map

Peavine Division Layout
    About the Peavine Layout
    Track Plan
    Guiding Principles
    Engine Roster
    Industries
Other Layouts
    Marien Switching District
    Offal, IN Branch

Influences and Inspirations
    Favorite Layouts

How Do
    Paperwork
The Real Peavine
    About the Peavine
    Prototype Industries
    1987 Inspection Trip
    1965 Timetable

Photo and Video Galleries
    Prototype Gallery
    Peavine Gallery
       Walk The Line
    Model Gallery
About
    Owner: David Lamb
    Contact the WO
    About The Site
    About The Home Page
 
Copyright 2013 - 2024