Posted to Facebook CET Group by David Rohdenburg, June 9, 2017. Description below is from the FB post.
After the Conductor lined the switch at VALLEY and returned to the cab, NS T96 gets underway again as they head toward the former N&W Clare Yard with 17 cars for the transload facility and the CCET interchange. June 8, 2017.